Pre-Operation Preparation
A comprehensive risk assessment should be carried out and a written lift plan prepared before every lifting operation.
Ground Analysis
Loads applied to the crane, outrigger pads and ground safety factors must be calculated.
Team Communication
An agreed signal system must be used for continuous communication throughout the operation.
PPE (Personal Protective Equipment)
Hard hat, safety boots and reflective vest are the minimum requirements.